Strenči Tree Nursery

Climate system installation for AS Latvijas meži

On 22 October 2024 in Trikāta parish, Valmiera municipality, the following were carried out climate system construction works AS Latvian State Forests Strenči tree nursery. As part of the project, a full ventilation system for production premises was implemented – from design and pipe installation up to airflow adjustment, system testing and commissioning.

When installing heat recovery unit Komfovent Verso R 5000 H C5 with an output of 5270 m³/h, efficient air exchange and a stable microclimate are ensured, supporting an energy-efficient and sustainable working environment in the production process.

Veterinary medical practice

Construction of ventilation, heating and air conditioning systems

On 6 July 2023 in Smiltene, Smiltene Municipality, the project was completed “Construction of ventilation, heating and air conditioning systems at a veterinary medical practice facility”. The work included full climate system installation, including pipework installation, airflow adjustment, system testing and commissioning, as well as connecting the heat substation to the existing heating boiler.

To ensure room microclimate, installed ventilation unit VTS CLIMA and Midea air conditioners with capacities 7 kW un 5.3 kW, which guarantees efficient air exchange, stable temperature maintenance and a comfortable environment for the veterinary clinic’s daily work.

Completed project
Completed project

Vidzeme Hospital

Installation of a ventilation unit

On 16 June 2025 in Valmiera, at Vidzeme Hospital, work was started on ventilation equipment installation, scheduled for completion in October. As part of the project, the following are being carried out climate system installation work, including pipework installation, air flow balancing, system testing and commissioning, ensuring efficient and safe air exchange in the medical facility's premises.

Installed at the hospital ventilation unit Envistar Flex AHU2 with an output of 7200 m³/h will ensure a stable microclimate and high air quality standards, which are essential for the comfort and health of patients and staff.

Shopping centre

Installation of an air-cooling heat pump in Valka

On 12 September 2025 a project was completed in Valka “Installation of an air-cooling heat pump at a shopping centre”. As part of the project, the following were carried out climate equipment installation work, including servicing the old equipment and leaving it as a backup solution, pipe installation, dismantling of the old pipe system, as well as system testing and commissioning.

For the efficient and energy-saving operation of a shopping centre, installed the modular air-cooling heat pump Asami, which ensures a stable indoor microclimate and maintains comfortable conditions for both visitors and staff all year round.

Completed project
Completed project

Competence centre

Bosch air-to-water heat pump installation in Valmiera

On 14 December 2025 we started installing a Bosch 5800i Compress heat pump, which we completed on 16 December 2025. 

As part of the work we carried out installation of the indoor and outdoor units, connection of the hydraulic section, electrical wiring, filling the system with demineralized water, commissioning, start-up and air bleeding.

Questions?

Contact us and find the best solution

Do you have questions about ventilation, air conditioning or heat pumps? Our experts will help you find the most suitable solution for you. Quickly, accurately and without unnecessary stress.

We use cookies to improve your experience on our website. By continuing to use the site, you agree to the use of cookies.